ENERGY MANAGEMENT SYSTEM IN SERBIA

Project Results

1 Projects co-financed by UNDP/GEF grant facility and Energy Efficiency Budget Fund in the period from 2017 to 2019

Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
(RSD) (RSD) (RSD) (kWh/year) (t/year)
25,000,000 56,369,000 135,998,545 2,096,694 1,488.5
Municipal energy efficiency projects co-financed by UNDP/GEF
LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
(RSD) (RSD) (RSD) (kWh/year) (t/year)
1 Žagubica Building of the secondary technical school in Žagubica
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Boiler room reconstruction along with replacement of existing coal-fired boilers with pellet-fired boilers (600 kW).
  • Installation of heat storage.
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • 2,500,000 5,636,900 21,790,863 418,082 285.89
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    2 Raška Building of the primary school „Sutjeska“ in the village Supnje
  • Replacement of windows and doors.
  • Boiler room reconstruction along with replacement of existing coal-fired boilers with pellet-fired boilers (600 kW).
  • Replacement of radiators.
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • 2,500,000 5,636,900 13,969,036 114,019 239.19
    Before
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    3 Knjaževac Building of the grammar school in Knjaževac
  • Replacement of windows and doors.
  • Insulation of attic.
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • 2,500,000 5,636,900 12,504,106 433,111 268.41
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    4 Lapovo Municipal building in Lapovo
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Boiler room reconstruction along with replacement of existing coal-fired boilers with pellet-fired boiler (90 kW).
  • Installation of PLC system, VSD circulation pump, thermostatic valves and calorimeters.
  • Installation of zone control system.
  • 2,500,000 5,636,900 14,867,894 107,860 57.20
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    5 Šabac Building of the primary school "Stojan Novaković" Šabac, unit Letnjikovac
  • Boiler plant reconstruction along with replacement of existing LFO-fired boilers with wood chips-fired boiler (500 kW) along with chips feeder and equipment for ash removal.
  • Installation of heat storage.
  • Installation of remote control of boiler plant.
  • Installation of VSD circulation pump.
  • 2,472,000 5,150,000 11,330,000 71,433 79.41
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    6 Medveđa Municipal building in Medveđa
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Construction of the new boiler plant along with replacement of existing coal-fired boilers with pellet-fired boiler (300 kW).
  • 1,448,251 3,017,190 7,241,256 37,206 76.96
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    7 Ljubovija Municipal building in Ljubovija
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Boiler room reconstruction along with replacement of existing coal-fired boilers with pellet-fired boiler (320 kW).
  • Installation of heat storage.
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • 1,999,183 4,164,965 9,162,923 203,244 120.00
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    8 Lučani Municipal building in Lučani
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Boiler plant reconstruction along with replacement of existing coal-fired boilers with gas-fired boilers (50 kW).
  • Installation of PLC system, VSD circulation pump, thermostatic valves and calorimeters.
  • Installation of zone control system.
  • 2,500,000 5,231,119, 11,508,463 77,163 59.32
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    9 Pećinci Building of the primary school "Slobodan Bajić Paja", unit in the village Donji Tovarnik
  • Insulation external walls and roof.
  • Boiler room reconstruction along with replacement of existing coal-fired boilers with pellet-fired boiler (150 kW).
  • Installation of VSD circulation pump.
  • 1,600,191 3,333,733 8,000,959 230,059 61.23
    Before
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    10 Svilajnac Building of the PUC Morava Svilajnac
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • 938,708 1,955,643 4,693,543 78,008 118.37
    Before
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    11 Žabari Building of the primary school „Heroj Rosa Trifunović“ in the village Aleksandrovac
  • Insulation external walls and roof.
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • 1,864,148 3,883,642 9,320,742 124,323 49.13
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    12 Kruševac Multi-purpose building in the village Trmčare, (primary school Dragomir Marković, PU Nata Velјković, and local municipal unit Trmčare)
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Boiler room reconstruction along with installation of a new gas-fired condensing boiler (50 kW).
  • Installation of VSD circulation pump, thermostatic valves and calorimeters.
  • Installation of zone control system.
  • 801,147 1,669,057 3,671,926 120,197 73.35
    Before
    Works in progress
    After
    LSG Name of building Type of works Energy Efficiency Fund of RS UNDP/GEF grant Total investment value Final energy savings CO2 Emission reduction
    (RSD) (RSD) (RSD) (kWh/year) (t/year)
    13 Velika Plana Building of CZK "Masuka" in Velika Plana
  • Replacement of windows and doors.
  • Insulation external walls and roof.
  • Modernization of DH substation, Installation of PLC system, VSD circulation pump, thermostatic valves and calorimeters.
  • 1,731,672 3,607,650 7,936,830 81,989 16.4
    Before
    Works in progress
    After

    2 Reconstructing and equipping the server hall of the Ministry of Mining and Energy

  • Pulling down of existing constructing elements (flooring, sealing, radiators, doors, windows, etc);
  • Construction works;
  • Deinstallation of existing and laying down the new water supply & sewerage pipeline and electrical installations;
  • Interior works;
  • Tiling works;
  • Installing the new AC and ventilation systems;
  • Installing the telecommunication equipment;
  • Procuring and installing the new server, PCs and auxiliary equipment;
  • Procuring, installing and maintaining the licensed system Oracle Database Standard Edition 2.
  • After

    3 Guidebook for energy managers in municipalities

    4 Guidebook for energy managers in buildings

    5 Guidebook for the procurement of electricity and optimization of electricity costs in public buildings and institutions in Serbia

    6 Guidebook for connecting and automatic transfer of remote readings and invoices into ISEM

    7 Energy management in municipalities and cities – guidebook for communication

    8 Energy efficiency – guidebook for maintenance technicians in buildings

    9 Guidebook for elaboration of annual report in SEMIS database

    10 Guidebook for objects from ISEM to SEMIS database

    11 ISEM – Guidebook user’s guide

    12 ISEM – Guidebook administrator’s guide

    13 ISEM – Guidebook for module on public lighting

    14 ISEM – Guidebook for module on energy efficiency fees

    15 Local self-government units which signed the Energy Efficiency Charter od Standing Conference of Towns and Municipalities

    16 Local self-government units in which EMIS end-users have been trained. In total, 1136 EMIS end-users have been trained since 2016.